The options also consist of an enormous battery at the positioning, to be sure excessive ability is usually stored to the evening, and a 220 kV transmission line that can join the venture on the North Star sub-station, in close proximity to wherever a whole new 100 MW solar task https://citypointsolar.com.au/get-in-touch/