The follower retains the zero conclude on the chain at ‘P’ and directs the leader at P1 to be in the road of PQ and stretch the chain or tape over the bottom in horizontal line. The surveyor directs the assistant to move the rod towards the remaining or appropriate https://sbscltd.com/