Project Summary Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a major confectionery manufacturing site in York. This initiative demonstrates a notable step forward in the client’s ESG commitments, enhancing operational resilience and ensuring measurable reductions in both power usage and carbon output. https://keybookmarks.com/story20748558/energy-efficient-400-kw-chiller-installation-secures-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-cut